Experts said that although the weather is dry and cold in winter, as long as the preparations before the paving, the moisture-proof treatment and the control of the humidity, the floor can fully achieve a good paving effect, the owners do not have to be nervous.
Do not open the package in advance. The outdoor temperature in Beijing is usually below 0 °C, and the temperature difference between indoor and outdoor is extremely large. According to experts, after the floor has been transported to the paving site by long-distance transportation, it should not be opened immediately, because the floor temperature is lower and the indoor temperature is relatively high. If the bag is opened, the floor will have condensation water, which will easily cause deformation. The correct way to handle it is to place the floor pack for more than 24 hours, and then adapt the floor to the surrounding environment before opening the bag. After opening the package, if a curved floorboard is found, it is recommended to shorten it and then lay it out, so that it will not be wasted and the overall paving quality will be guaranteed.
Moisture protection must be done at present, and many new residential buildings have adopted geothermal heating systems. If the moisture content of the concrete floor is too high, the floor will be easily damp and open when the ground moisture is turned off after the geothermal system is turned on. Some industry insiders suggest that the floor moisture content is within 10%, and the wall surface moisture content is within 20%. The effect of paving the floor is best, but Wang Jun said that many paving workers are currently unable to grasp the water content, even if there is an instrument. It is not particularly precise. In order to solve this problem, it is recommended to do a layer of moisture-proof treatment with or without heating or the moisture content of the wall.
How to do moisture treatment? Before paving the floor, you can lay a plastic film on the floor, overlap 20 cm at the seam, seal with tape, and make sure the ground is smooth and free of sand, so as not to damage the plastic film to affect the moisture-proof effect. Wang Jun also suggested that in order to prevent the influence of wall moisture on the floor, the plastic film is preferably returned to the height of the skirting board. In the case of geothermal heating, the heating system should be tested for normal operation and all remaining moisture on the concrete floor should be evaporated.
Geothermal best suspended paving solid wood flooring is generally paved with keel, but if the home is a geothermal environment, it is best to choose a suspended pavement to avoid the part of the keel affecting the heating effect. Composite flooring such as laminate flooring, engineered wood flooring and three-layer solid wood composites are also generally selected for suspension paving. Although some consumers consider using a keel to lay three-layer parquet for the sake of their feet, Wang Jun said that keel pavements often have loud sounds and are costly and unsuitable for geothermal environments. The suspension laying method of the three-layer solid wood composite floor is relatively simple, the operation is also easy, the maintenance is very convenient, the home is geothermal, and the heat dissipation is also easy, and the deformation of the floor caused by the moisture resistance of the keel and the absorption of moisture can be avoided. It is worth noting that the difference in dry and wet weather in the northern region is large. If you are worried that the suspended pavement will cause the floor to sway, the floor can be fixed with springs at the expansion joints reserved on both sides of the wall.
The size of the expansion joints is due to the dry weather in winter. Compared with the summer, many people think that the installation of the floor in winter needs to keep the shirring, but experts say that this is wrong, and how to leave the seam depends on the actual situation. Solid wood flooring generally calculates the size of the expansion joint according to the moisture content of the floor, while the composite flooring generally satisfies the demand between 8-12mm. It is not necessary to consider leaving more or less, after all, there will be wet expansion in summer.
Pay attention to the regulation of temperature and humidity, the air humidity is relatively low in winter, and many consumers will also purchase a humidifier to adjust the indoor humidity. Experts said that the relative humidity in the room should be kept above 40%, which is not only beneficial to human health, but also good for the floor. If it is geothermal heating, the geothermal water supply temperature should not exceed 60 ° C, the cement floor temperature should not exceed 42 ° C, the floor surface temperature should be controlled between 25 ° C and 28 ° C.
In addition, the adjustment performance of the wooden floor itself can also play a certain role in the change of indoor temperature and humidity. However, experts also said that the adjustment of indoor humidity mainly depends on human maintenance. If the floor is installed and does not stay, the owner needs to check it frequently, and consider using tools such as smart humidifier to keep the humidity above 40%, of course, the humidity can reach 50%. -60% is better. Due to the outdoor drying, the owner does not have to consider window ventilation to avoid causing the indoor humidity to drop.
Heavy furniture should not be placed symmetrically on the floor. After 12 hours of installation, furniture can be placed, but it should be noted that heavy furniture should be laid down smoothly, and can not be pushed and pulled forcibly, so as not to scratch the floor surface, and heavy furniture should not be placed symmetrically. Focus on one side of the room to reserve enough space for the floor to avoid arching.
Do not open the package in advance. The outdoor temperature in Beijing is usually below 0 °C, and the temperature difference between indoor and outdoor is extremely large. According to experts, after the floor has been transported to the paving site by long-distance transportation, it should not be opened immediately, because the floor temperature is lower and the indoor temperature is relatively high. If the bag is opened, the floor will have condensation water, which will easily cause deformation. The correct way to handle it is to place the floor pack for more than 24 hours, and then adapt the floor to the surrounding environment before opening the bag. After opening the package, if a curved floorboard is found, it is recommended to shorten it and then lay it out, so that it will not be wasted and the overall paving quality will be guaranteed.
Moisture protection must be done at present, and many new residential buildings have adopted geothermal heating systems. If the moisture content of the concrete floor is too high, the floor will be easily damp and open when the ground moisture is turned off after the geothermal system is turned on. Some industry insiders suggest that the floor moisture content is within 10%, and the wall surface moisture content is within 20%. The effect of paving the floor is best, but Wang Jun said that many paving workers are currently unable to grasp the water content, even if there is an instrument. It is not particularly precise. In order to solve this problem, it is recommended to do a layer of moisture-proof treatment with or without heating or the moisture content of the wall.
How to do moisture treatment? Before paving the floor, you can lay a plastic film on the floor, overlap 20 cm at the seam, seal with tape, and make sure the ground is smooth and free of sand, so as not to damage the plastic film to affect the moisture-proof effect. Wang Jun also suggested that in order to prevent the influence of wall moisture on the floor, the plastic film is preferably returned to the height of the skirting board. In the case of geothermal heating, the heating system should be tested for normal operation and all remaining moisture on the concrete floor should be evaporated.
Geothermal best suspended paving solid wood flooring is generally paved with keel, but if the home is a geothermal environment, it is best to choose a suspended pavement to avoid the part of the keel affecting the heating effect. Composite flooring such as laminate flooring, engineered wood flooring and three-layer solid wood composites are also generally selected for suspension paving. Although some consumers consider using a keel to lay three-layer parquet for the sake of their feet, Wang Jun said that keel pavements often have loud sounds and are costly and unsuitable for geothermal environments. The suspension laying method of the three-layer solid wood composite floor is relatively simple, the operation is also easy, the maintenance is very convenient, the home is geothermal, and the heat dissipation is also easy, and the deformation of the floor caused by the moisture resistance of the keel and the absorption of moisture can be avoided. It is worth noting that the difference in dry and wet weather in the northern region is large. If you are worried that the suspended pavement will cause the floor to sway, the floor can be fixed with springs at the expansion joints reserved on both sides of the wall.
The size of the expansion joints is due to the dry weather in winter. Compared with the summer, many people think that the installation of the floor in winter needs to keep the shirring, but experts say that this is wrong, and how to leave the seam depends on the actual situation. Solid wood flooring generally calculates the size of the expansion joint according to the moisture content of the floor, while the composite flooring generally satisfies the demand between 8-12mm. It is not necessary to consider leaving more or less, after all, there will be wet expansion in summer.
Pay attention to the regulation of temperature and humidity, the air humidity is relatively low in winter, and many consumers will also purchase a humidifier to adjust the indoor humidity. Experts said that the relative humidity in the room should be kept above 40%, which is not only beneficial to human health, but also good for the floor. If it is geothermal heating, the geothermal water supply temperature should not exceed 60 ° C, the cement floor temperature should not exceed 42 ° C, the floor surface temperature should be controlled between 25 ° C and 28 ° C.
In addition, the adjustment performance of the wooden floor itself can also play a certain role in the change of indoor temperature and humidity. However, experts also said that the adjustment of indoor humidity mainly depends on human maintenance. If the floor is installed and does not stay, the owner needs to check it frequently, and consider using tools such as smart humidifier to keep the humidity above 40%, of course, the humidity can reach 50%. -60% is better. Due to the outdoor drying, the owner does not have to consider window ventilation to avoid causing the indoor humidity to drop.
Heavy furniture should not be placed symmetrically on the floor. After 12 hours of installation, furniture can be placed, but it should be noted that heavy furniture should be laid down smoothly, and can not be pushed and pulled forcibly, so as not to scratch the floor surface, and heavy furniture should not be placed symmetrically. Focus on one side of the room to reserve enough space for the floor to avoid arching.